Skip to content
Shipping container sales / Modifications / Build-outs
Home / A good project needs
a good arrival.
DELIVERY & SITE PREPARATION

A good project needs
a good arrival.

Delivery planning starts before the truck moves. Share the site details early so access, equipment, and placement can be reviewed.

PLAN THE LAST MILE

Make room for a smooth delivery.

01 / SITE CHECK

Access route

Share gate widths, road surfaces, tight turns, bridges, and any route restrictions. The delivery method determines the required clearance.

02 / SITE CHECK

Overhead clearance

Identify utility lines, trees, building overhangs, and other overhead obstructions along the entire access and placement route.

03 / SITE CHECK

Firm & level ground

Plan a stable surface and appropriate container support. Soft ground, recent rain, slopes, and drainage can affect placement.

04 / SITE CHECK

Placement orientation

Confirm which way the doors should face and how the space will be used. Leave room to open doors and service the container.

05 / SITE CHECK

Utility connections

For build-outs, coordinate power, water, wastewater, data, and any foundation work with the project scope and local requirements.

06 / SITE CHECK

Photos & final review

Provide clear photos or a short video of the route and placement area. Confirm delivery equipment, clearance needs, and site readiness before scheduling.

Delivery availability, method, pricing, and placement requirements are confirmed for each site. Permit, foundation, utility, and site preparation responsibilities must be established in the project proposal.

LET’S BUILD WHAT’S NEXT

Your project. Our next conversation.

Tell us what you need, where it’s going, and how you’ll use it.

Start your project
Get a quote ↗
Build-out gallery